Ashwood Commons

ASHWOOD COMMONS, 909 112TH AVE NE, BELLEVUE

2-Phase mixed-use development located in downtown Bellevue. Phase-1 consisted of a 25-story multi family residential building, while Phase-2 consisted of two 10-story office towers.  Soil nail shoring was utilized for the approximate 40 to 50-foot deep excavation. Groundwater required the installation of temporary dewatering sumps and permanent under slab drains.